Akron Children’s Hospital – Critical Care Tower

Akron Children's Hospital

$3,000,000

Kenmore Construction was contracted to perform the mass excavation and site utilities for the Akron Children’s Hospital Critical Care Tower. Included in the site package for this project was demolition of the existing buildings, 50,000 CY of mass excavation, installation of an earth retention system, crane tower pits and site utilities.